19/11/00
Work on stripping Gelerts boiler has now started, these are
some of the latest photos |
|
| |
 |
 |
|
9/12/00
The boiler has now been removed from the frames. |
 |
 |
|
|
Christmas 2000, and the tubes have been removed, and work started in
removing the faulty stays.
|
|
 |
 |

Click here for the movie image |
|
The old boiler tubes.
|
|
|
At the same time, Gelerts Sister loco, Bagnal 3023, has its boiler readied for the boiler
inspector.
|
|
|
April, and now all the faulty stays, including all the ones installed by
'Winsons', have been removed. |
 |
|
|
Dave Ruston Works on the boiler, stored behind the frames. |
 |
|
|
|
|
|
|
|
|
|
|
|
|